This week has been all about pipes at the Westnedge site! Here are some shots of what is new since last week’s post.
The water line has been run to the foundation…

the water line
The plumber is putting in some pipes before the floor is poured…

plumbing in what will be the floor
It’s always a good idea to have tools and a plan!

the plan
Connect With Us!