We’re down to the last days before opening at Westnedge! The toilet flushes in the bathroom, the sink runs and drains, the drinking fountain works, and most of the trim has been put up. The handicap grab bars for the bathroom should be arriving via UPS on Monday and will be installed along with the rest of the trim and the cabinets in the snack area. Then all that remains is to move in the furniture and get the final inspection from the City of Kalamazoo and we’ll be able to open!